SMPTE or not to SMPTE…
Posted: Mon Jan 26, 2026 21:52
Is it possible to have SMPTE on envelopes instead of Timeline, basic or all the other types assigneable?
I want my envelopes to follow along with SMPTE, not just trigger a start of an envelope on a timeline.
Is there anyway to link envelopes so that one envelope acts as a master and everything linked to it follows the master envelope and all changes is thus always the same in all envelopes...?
Perhaps even allow all the settings from an envelope and timeline be linked so that one setting can be used as a master controller for many other linked envelopes and timelines.
I want my envelopes to follow along with SMPTE, not just trigger a start of an envelope on a timeline.
Is there anyway to link envelopes so that one envelope acts as a master and everything linked to it follows the master envelope and all changes is thus always the same in all envelopes...?
Perhaps even allow all the settings from an envelope and timeline be linked so that one setting can be used as a master controller for many other linked envelopes and timelines.