Does Wire utilize push or pull evaluation of the graph, or neither? I.e. should I use a switch or a gate, both or neither to optimize unused calculations where the user have a choice?
Events are more efficient, and can happen async from the render pass.
If it's a variable that rarely changes Event would be better.
Software developer, Sound Engineer,
Control Your show with ”Enter” - multiple Resolume servers at once - SMPTE/MTC column launch
try for free: http://programs.palffyzoltan.hu