Hello.
I'm extremely new to wire.
I am making a patch that will let you select a different video file from a drop own menu. This will let me reduce about 35 layers in my composition.
Everything is working good so far. But I can't figure something out.
How do you display the duration of a video asset in wire to the clip window on resolume someplace?
Or how do you update the duration in the transport area to the current duration of the video asset that was selected.
Thank you.
Display duration of video asset
Re: Display duration of video asset
Updating params from Wire patch to the host is not possible currently.
Software developer, Sound Engineer,
Control Your show with ”Enter” - multiple Resolume servers at once - SMPTE/MTC column launch
try for free: http://programs.palffyzoltan.hu
Control Your show with ”Enter” - multiple Resolume servers at once - SMPTE/MTC column launch
try for free: http://programs.palffyzoltan.hu
-
- Posts: 105
- Joined: Thu Dec 07, 2023 08:41
Re: Display duration of video asset
I hope that is coming soon.